The homeowners chose their kitchen from their own supplier and had a clear idea of the finish they wanted: timber worktops and a tiled splashback with red grout. Our team carried out the full renovation, from stripping out the old kitchen to fitting the new units and worktops.
We took the room back to brick, prepared the walls and installed electric underfloor heating. We then levelled the floor and gave it time to dry before laying the tiles. Once the units and timber worktops were in place, we tiled the splashback and finished the joints in the red the homeowners had chosen.